epc

Contract Title

Contract No.

Contractor

Duration

Project: Bai Hasan & Avana Dome Oil Field \ 2015

01

Installation of cold stripping unit - C - at Saralu

KARFZE - 2015 0004

SWAT Co

08- 04- 2015

07 - 11 - 2015

Project: GAS JV project ( Galyawa , ASC , SWAT )

Disassembly of cold stripping unit in Shoraw

KARFZE - 2015 0008

02

SWAT Co

05 - 01 - 2015

04 - 05 - 2015

03

WATER INTAKE for both power station Shatt Al-Basra and Rumila power station

KEPPT water intake

GAS JV

06- 06 -2020

25 -03- 2021

04

DCS system and SCADA for pipeline project

KAR2301 - PRC - PO - 000 - 00 - 0020 MAV

SWAT Co

2023

05

Instrument package for all station and main pipeline

KAR2301 - PRC - PO - 000 - 00 - 0017

SWAT Co

Project: KAR GP ltd. KAR gas pipeline

2023

Automation projects

Contract Title

Contract No.

Contractor

Duration

Project: Atrush Export Pipeline System 2016-2017

Installation of cold stripping unit - C - at Saralu

KARFZE - 2015 0004

SWAT Co

8 Months

Disassembly of cold stripping unit in Shoraw

KARFZE - 2015 0008

SWAT Co

5 Months

WATER INTAKE for both power station Shatt Al-Basra and Rumila power station

KEPPT water intake

GAS JV

9 Months

DCS system and SCADA for pipeline project

KAR2301 - PRC - PO - 000 - 00 - 0020 MAV

SWAT Co

2023

Instrument package for all station and main pipeline

KAR2301 - PRC - PO - 000 - 00 - 0017

SWAT Co

2023